soXos 6S Battery Plate Carbon # 6069

Product number: SO-6069

Spare part suitable for Heli Professional soXos 550 / 600 / Strike 6.1 / 700 / DB7 / Strike7 / Strike7.1 / Strike7.1 light

Questions about product Sign in to watch list

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

6S Battery Plate Carbon

Includes:
6S Battery Plate Carbon

Spare part suitable for:
soXos 550 / 600 / Strike 6.1 / 700 / DB7 / Strike7 / Strike7.1 / Strike7.1 light
Customers also bought:
BEC-Backup
1st Buffer-Pack 50F V4.12 for Helis 500-800
1st Buffer-Pack 50F V4.12 for Helis 500-800
Backup battery for electric helicopters for safe emergency landingCurrent peak buffers for remote-controlled models (airplane, helicopters, etc.) New with RC switch-off, Telemetry and up to 13V BEC!
Art. 1st9543

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

55,99 €*
soXos Battery Plate
soXos Battery Plate
Spare part suitable for Heli Professional soXos 550 / 600 / Strike 6.1 / 700 / DB7 / Strike 7 / Strike 7.1 / Strike 7.1 light / 800
Art. SO-8095

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

15,90 €*
soXos Ball Link M2,5
soXos Ball Link M2,5
Spare part suitable for Heli Professional soXos 550 / 600 / Strike 6.1
Art. SO-6036-1

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

9,50 €*
soXos Servo Horn (3pcs)
soXos Servo Horn (3pcs)
Spare part suitable for Heli Professional soXos Strike 6.1 / Strike 7.1 / Strike 7.1 light / PAUL
Art. SO-7075-3

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

31,60 €*
Wesentliche Information zu Kundenbewertungen:

Wir stellen nicht sicher, dass die veröffentlichten Bewertungen von solchen Verbrauchern stammen, die die Ware tatsächlich genutzt oder erworben haben.

No review available for this product.

* incl. tax, plus shipping costs

** for the payment method prepayment from the day after the customer´s payment instruction; for other payment methods from the day after the conclusion of the contract