• You are here:

MS Composit Carbon Tail Blades 105mm /5/3-FC # MS-R70105-FC

Product number: MS-R70105-FC

Suitable for: T-REX 700 / Goblin 700 usw.

Questions about product Sign in to watch list

Product Reminder

Currently sold out

CFC Tail Blades 105 mm/5/3

MS Composit manufactures a broad line of carbon composite tail rotor blades. The tail rotor blades manufacturing technology is derived from the main rotor blades, and ensures high blade performance in all situations. All MS Composits tail rotor blades are dynamically balanced and tested for overload. The security factor (blade dynamic overload) is 2.1 for all types of tail blades.

Technical specifications:
Length: 105 mm
Width: 29mm
Blade type: Standard
Root: 5 mm
Bolt: 3 mm
Profile: Symm
Weight: 7 g



Suitable for:
T-REX 700 / Goblin 700 usw.

Customers also bought:
SAB Goblin RAW 700 Black Battery Hatch
SAB Goblin RAW 700 Black Battery Hatch
Spare part suitable for SAB Heli Devision Goblin RAW 700
Art. H1347-S

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

11,00 €*
Hauptrotorblätter 360mm
Align 450L DOMINATOR 360 Carbon Fiber Blades-Blue
Align 450L DOMINATOR 360 Carbon Fiber Blades-Blue
Spare part suitable for: Align 450L DOMINATOR # HD360B Align Prod. # HD360BT
Art. HD360B

Currently sold out

20,79 €*
Product Reminder
Heckrotorblätter 74mm
Align T-REX 470L 74 Tail Blade
Align T-REX 470L 74 Tail Blade
Spare part suitable for: Align T-REX 470L - Align Prod. # HQ0743AT
Art. HQ0743A

Currently sold out

11,59 €*
Product Reminder
Regler-Zubehör
Hobbywing VBAR Connection wire for Platinum 50cm
Hobbywing VBAR Connection wire for Platinum 50cm
Art. HW30810001

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

9,90 €*
Wesentliche Information zu Kundenbewertungen:

Wir stellen nicht sicher, dass die veröffentlichten Bewertungen von solchen Verbrauchern stammen, die die Ware tatsächlich genutzt oder erworben haben.

No review available for this product.

* incl. tax, plus shipping costs

** for the payment method prepayment from the day after the customer´s payment instruction; for other payment methods from the day after the conclusion of the contract