Sab Goblin 500 / 570 Carry Bag - Red # HM059

Product number: HM059

Sab Goblin 500 / 570 / 580 Carry Bag - Red # HM059

Questions about product Sign in to watch list

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

Sab Goblin 500 / 570 / 580 Carry Bag - Red # HM059

Instruction:

Use for Sab Goblin 500 / 570 / 580

Descriptions:

This SAB carry bag is specifically designed to hold and protect Goblin 500 / 570 helicopters, utilizing superior grade water resistant canvas.

The protection foams inside hold the helicopter securely in an upright position.

Extra thick padding ensures an excellent protection for your Sab Goblin helicopters.


Dimension (cm)    

Length 125
High 37
Width 20

Inner pocket
Length 35
High 18
Width 9

Important notice:

Please turn off your helicopter and radio before storing in bag to ensure safety during transport.

Customers also bought:

Empfänger Zubehör
Spektrum SRXL2 Update Cable Receiver / Servo

Spektrum SRXL2 Update Cable Receiver / Servo

Also suitable as an SRXL2 connection cable for flybarless systems
Art. SPMA3066

Currently sold out

9,99 €*
Product Reminder
shrink tub 1m Ø 4mm Black

shrink tub 1m Ø 4mm Black

Art. ZB-1502-4-S

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

1,59 €*
XT90 Gold Connector 4,5mm with yellow case

XT90 Gold Connector 4,5mm with yellow case

Art. ZB-ST-XT-90

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

1,90 €*
Servo Extension wire JR 15cm 22AWG

Servo Extension wire JR 15cm 22AWG

Art. ZB-SV-JR-15

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

2,40 €* 16,00 € / Meter

Wesentliche Information zu Kundenbewertungen:

Wir stellen nicht sicher, dass die veröffentlichten Bewertungen von solchen Verbrauchern stammen, die die Ware tatsächlich genutzt oder erworben haben.

No review available for this product.

* incl. tax, plus shipping costs

** for the payment method prepayment from the day after the customer´s payment instruction; for other payment methods from the day after the conclusion of the contract