Align T-REX 700X / 700L / 700E Upgrade Tail Assembly 760 # H76T001XX

Product number: H76T001XX

Spare part suitable for: Align T-REX 700X / 700L / 700E - Align Prod. # H76T001XXT

Questions about product Sign in to watch list

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

Upgrade Tail Assembly 760


1x Carbon Tail Boom (Ø20.3xØ21.5x855mm)
1x Torque Tube (M7.2xØ8x848mm)
2x Torque tube end (M7.2xØ7.95x30mm)
2x Bearing MR148ZZ (Ø8xØ14x4mm)
2x Torque Rod Sleeve (Ø7.95xØ10.5x5mm)
1x Carbon Tail Control Rod (Ø2.7xØ5x828mm)
2x Linkage Rod C (Ø2.5xØ23mm)
2x 700NFL Ball Link (Ø5xØ20.5mm)
2x Carbon Tail Control Rod sleeve (Ø2.6xØ6x11mm)
1x Tail Control Guide sleeve (Ø5xØ6x35mm)

 

Spare part suitable for:
Align T-REX 700X / 700L / 700E

Customers also bought:

Align T-REX 650X Vertical Stabilizer

Align T-REX 650X Vertical Stabilizer

Spare part suitable for: Align T-REX 650X - Align Prod. # H65T002XXW
Art. H65T002XX

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

31,49 €*
Align T-REX 550 / 600 / 700 / 800 Landing Skid

Align T-REX 550 / 600 / 700 / 800 Landing Skid

Spare part suitable for: Align T-REX 550 / 600 / 700 / 800 - Align Prod. # H70F001XXW
Art. H70F001XXT

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

10,39 €*
Align T-REX 650X Battery Latch

Align T-REX 650X Battery Latch

Spare part suitable for: Align T-REX 650X - Align Prod. # H65B006XXW
Art. H65B006XX

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

20,99 €*
Align T-Rex 700E Skid Pipe /silver

Align T-Rex 700E Skid Pipe /silver

suitable for: T-Rex 700E # HN7049QF Align Prod. # HN7049QFT
Art. HN7049QF

Currently sold out

8,09 €*
Product Reminder

Wesentliche Information zu Kundenbewertungen:

Wir stellen nicht sicher, dass die veröffentlichten Bewertungen von solchen Verbrauchern stammen, die die Ware tatsächlich genutzt oder erworben haben.

No review available for this product.

* incl. tax, plus shipping costs

** for the payment method prepayment from the day after the customer´s payment instruction; for other payment methods from the day after the conclusion of the contract