1st Main Blades CFK 710mm FBL (Yellow)

Product number: 1stB710-Y

Questions about product Sign in to watch list

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

Main Blades CFK 710mm FBL


Technical specifications:
blade length: 710mm
blade admission: 14mm
borehole: 5mm
Weight per blade: approx. 198g
max. rpm: 2600
blade width / depth: 64mm
profile: Fully symmetrical
direction of rotation: clockwise
number of blade: 2

Attributes
Module Main Rotorblades
Part number 1stB710-Y

Customers also bought:

SAB Goblin ABEC-5 Flanged bearing  Ø6 x Ø13 x 5 (2pcs)

SAB Goblin ABEC-5 Flanged bearing Ø6 x Ø13 x 5 (2pcs)

Spare part suitable for: SAB Goblin SAB Heli Devision # HC414-S
Art. HC414-S

Currently sold out

5,50 €*
Product Reminder
Main Rotorblades
MS Composit Rapid FBL CFC main blades 71 cm/12/5

MS Composit Rapid FBL CFC main blades 71 cm/12/5

Suitable for: T-REX 700 / Goblin 700 / Protos MAX / CORE 700 usw..MS Composit # MS-R90710FBL
Art. MS-R90710FBL

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

86,31 €*
SAB Goblin 630 / 700 / 770 / CO Delrin Damperner For HPS2/3

SAB Goblin 630 / 700 / 770 / CO Delrin Damperner For HPS2/3

Spare part suitable for SAB Heli Devision Goblin Urukay / 630 / 700 / 770 / Competition / Speed Using New HPS2/3
Art. H0426-S

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

29,00 €*
SAB Goblin 630 Carbon Fiber Tail Push rod Ø4 x Ø2,5 x 635 mm

SAB Goblin 630 Carbon Fiber Tail Push rod Ø4 x Ø2,5 x 635 mm

Spare part suitable for: Goblin 630 SAB Heli Devision # HC237-S
Art. HC237-S

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

9,00 €*

Wesentliche Information zu Kundenbewertungen:

Wir stellen nicht sicher, dass die veröffentlichten Bewertungen von solchen Verbrauchern stammen, die die Ware tatsächlich genutzt oder erworben haben.

No review available for this product.

* incl. tax, plus shipping costs

** for the payment method prepayment from the day after the customer´s payment instruction; for other payment methods from the day after the conclusion of the contract