5 Minute Epoxy, kits (MR 1:1) / 200g # 1551001

Product number: 1551001

Questions about product Sign in to watch list

Base price: 84,50 € / 1Kg
Product Reminder

Currently sold out

Fast-setting, solvent- and filler-free two-component epoxy resin adhesive

Mixing ratio: 1 : 1 parts by weight / volume of resin to hardener
Processing time: 5 minutes
Loads can be applied to the bond after only 10 minutes

  • Good bond strength
  • Tough-hard formulation
  • Grindable

Fast-setting, solvent- and filler-free two-component epoxy resin adhesive of honey-like viscosity ideal for wood, metal, stone, rigid foams and many plastics.

Shear strength according to DIN 53281, Aluminium (AlCuMg1)9.3 MPa

 

kit = 100 g resin + 100 g hardener + spatula + mixing cup + processing instructions

Customers also bought:

Align T-Rex 700N Radius Arm

Align T-Rex 700N Radius Arm

suitable for: T-Rex 700 # HN7016 Align Prod. # HN7016T
Art. HN7016

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

4,40 €*
Silicone grease tube 6g

Silicone grease tube 6g

Art. ZBSK6G

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

3,90 €* 650,00 € / 1Kg
OMPHOBBY M2/ M2 V2/ M2 EXP Ø4mm main Shaft set for Performance Upgrade(2pcs)

OMPHOBBY M2/ M2 V2/ M2 EXP Ø4mm main Shaft set for Performance Upgrade(2pcs)

Spare part suitable for OMPHOBBY M2 2019 / M2 V2 / M2 Explore only use with Performance Upgrade Set
Art. OSHM2338

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

6,99 €*
Crash-Kit
OMPHOBBY M2 EVO Crash Kit - yellow

OMPHOBBY M2 EVO Crash Kit - yellow

Crash Kit suitable for OMPHOBBY M2 EVO
Art. OSHG0001

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

28,99 €*

Wesentliche Information zu Kundenbewertungen:

Wir stellen nicht sicher, dass die veröffentlichten Bewertungen von solchen Verbrauchern stammen, die die Ware tatsächlich genutzt oder erworben haben.

No review available for this product.

* incl. tax, plus shipping costs

** for the payment method prepayment from the day after the customer´s payment instruction; for other payment methods from the day after the conclusion of the contract