• You are here:

OXY Heli OXY3/4 Magnet Canopy Post # OSP-1340

Product number: OSP-1340

Spare part suitable for OSP-1262LYNX HELI INNOVATIONS # OSP-1340

Questions about product Sign in to watch list

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

PACKING LIST:
2 x OXY3 Break Away Magnet Canopy
2 x OXY4 Break Away Magnet Canopy
2 x Spacer 3x6x1.7
2 x M2 Black C Washer
2 x M2X5 Hex Cap Screw
2 x M2X4 Hex Cap Screw


Spare part suitable for:
OSP-1262 OXY3/4 Magnet Canopy Post


LYNX HELI INNOVATIONS # OSP-1340

Customers also bought:
SAB Goblin 770 LOW FRONT TAIL PULLEY
SAB Goblin 770 LOW FRONT TAIL PULLEY
Spare part suitable for: Goblin 770 SAB Heli Devision # H0172-S
Art. H0172-S

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

22,00 €*
SAB Goblin Plastic ball linkages (10pcs)
SAB Goblin Plastic ball linkages (10pcs)
Spare part suitable for: Goblin 380 / 500 / 570 / 630 / 700 / 770 / Kraken SAB Heli Devision # H0066-S
Art. H0066-S

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

11,00 €*
SAB Goblin 700 High Performance Tail Belt 2061-3GT-06
SAB Goblin 700 High Performance Tail Belt 2061-3GT-06
Spare part suitable for: Goblin 700 SAB Heli Devision # HC304-S
Art. HC304-S

Currently sold out

39,00 €*
Product Reminder
SAB Goblin 630 / 700 / 770 / CO Delrin Damperner For HPS2/3
SAB Goblin 630 / 700 / 770 / CO Delrin Damperner For HPS2/3
Spare part suitable for SAB Heli Devision Goblin Urukay / 630 / 700 / 770 / Competition / Speed Using New HPS2/3
Art. H0426-S

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

29,00 €*
Wesentliche Information zu Kundenbewertungen:

Wir stellen nicht sicher, dass die veröffentlichten Bewertungen von solchen Verbrauchern stammen, die die Ware tatsächlich genutzt oder erworben haben.

No review available for this product.

* incl. tax, plus shipping costs

** for the payment method prepayment from the day after the customer´s payment instruction; for other payment methods from the day after the conclusion of the contract