• You are here:

Align T-REX 700 / 800 Metal Tail Pitch Assembly # HN7079B

Product number: HN7079B

Spare part suitable for: Align T-REX 700X / 700L / 700E / 700N / 800E - Align Prod. # HN7079BT

Questions about product Sign in to watch list

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

Metal Tail Pitch Assembly

2x Control link (14.75x6x3.9mm)
2x 700 Collar (Ø2.5xØ3.5x4mm)
1x 700 Metal T type arm (28x12x11.5mm)
1x 700 Bearing holder (Ø12xØ15.4x11mm)
1x 700 Collar (Ø8xØ9.4x4mm)
1x 700N Slide shaft (Ø6xØ8x21mm)
2x Bearing MR128ZZ (Ø8xØ12x3.5mm)
2x Collar screw (M2x8mm)
2x Socket Button Head Collar Screw (M2.5x8mm)
2x Screw (M2x8mm)



Spare part suitable for:
Align T-REX 700X / 700L / 700E / 700N / 800E

Customers also bought:
Align T-Rex 700N Ball Link
Align T-Rex 700N Ball Link
suitable for: T-Rex 700 # HN7058-1 Align Prod. # HN7058T-1
Art. HN7058-1

Currently sold out

8,09 €*
Product Reminder
Align T-REX 700E / 700N /800E Tail Rotor Holder
Align T-REX 700E / 700N /800E Tail Rotor Holder
Spare part suitable for: Align T-REX 700X/700N/700E/800E - Align Prod. # H70T001BXW
Art. H70T001BX

Currently sold out

35,79 €*
Product Reminder
Align T-REX 700X Tail Pitch Control Link
Align T-REX 700X Tail Pitch Control Link
Spare part suitable for: Align T-REX 700X - Align Prod. # H70T009XXW
Art. H70T009XXT

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

6,99 €*
Align T-Rex 700 Torque Tube
Align T-Rex 700 Torque Tube
suitable for: T-Rex 700 # HN7056A Align Prod. # HN7056AT
Art. HN7056A

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

20,79 €*
Wesentliche Information zu Kundenbewertungen:

Wir stellen nicht sicher, dass die veröffentlichten Bewertungen von solchen Verbrauchern stammen, die die Ware tatsächlich genutzt oder erworben haben.

No review available for this product.

* incl. tax, plus shipping costs

** for the payment method prepayment from the day after the customer´s payment instruction; for other payment methods from the day after the conclusion of the contract