• You are here:

1st Tail Blades CFK 105mm CP (green) # 1stB105CP-G

Product number: 1stB105CP-G

High rigidity for perfect tail control

Questions about product Sign in to watch list

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

“CP” stands for competition version.

Developed for the competition pilot to achieve maximum precision.

Technical specifications:
Blade length: 105mm
Blade connection: 5mm
Bore: 3mm
Weight per blade: approx.6.7g
Blade width / depth: 30mm
Number of blades: 2


Customers also bought:
Align T-REX 700 / E / X / L / N / XN / 760X / 800E Tail Boom Support Rods
Align T-REX 700 / E / X / L / N / XN / 760X / 800E Tail Boom Support Rods
Spare part suitable for: Align T-REX 700X / 700L / 700N / 700XN / 700E / 760X / 800E - Align Prod. # H7NT007XXW
Art. H7NT007XX

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

20,79 €*
Align Tailboom Support Rods Reinforcement Plates T-Rex 700
Align Tailboom Support Rods Reinforcement Plates T-Rex 700
suitable for: T-Rex 700 # HN7112 Align Prod. # HN7112T
Art. HN7112

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

9,29 €*
Align T-Rex 700N Carbon Stabilizer/2.0mm
Align T-Rex 700N Carbon Stabilizer/2.0mm
suitable for: T-Rex 700 # HN7029 Align Prod. # HN7029T
Art. HN7029

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

25,29 €*
Align T-REX 700X / 700L / 700E / 800E M1 Torque Tube Front Drive Gear Set/22T
Align T-REX 700X / 700L / 700E / 800E M1 Torque Tube Front Drive Gear Set/22T
Spare part suitable for: Align T-REX 700X / 700L / 700E / 800E - Align Prod. # H70G001BXT
Art. H70G001BX

Currently sold out

18,49 €*
Product Reminder
Wesentliche Information zu Kundenbewertungen:

Wir stellen nicht sicher, dass die veröffentlichten Bewertungen von solchen Verbrauchern stammen, die die Ware tatsächlich genutzt oder erworben haben.

No review available for this product.

* incl. tax, plus shipping costs

** for the payment method prepayment from the day after the customer´s payment instruction; for other payment methods from the day after the conclusion of the contract