SAB Main Blades S700 - 3 Blades # S7003

Product number: S7003

Questions about product Sign in to watch list

Will be ordered for you

Within DE: 7 Business Days **
Outside DE: 10 Business Days**

Main Blades S700 - 3 Blades

NEW SAB Blades: the silent power!

New aerodynamics, new profiles, new construction philosophy. The blade produce great power without the need to turn at high rpm. Stable and precise, they are smooth and silent in all maneuvers.

This blade is the new standard for SAB!


Technical features:
Length : 700 mm
Width : 50/64 mm
Root : 12 mm Bolt
Hole : 5mm

Customers also bought:

SAB Goblin RAW 420 Carbon Fiber Main Frame

SAB Goblin RAW 420 Carbon Fiber Main Frame

Spare part suitable for SAB Heli Devision Goblin RAW 420
Art. H1464-S

Currently sold out

31,00 €*
Product Reminder
SAB Goblin RAW 420 Canopy Pink

SAB Goblin RAW 420 Canopy Pink

Spare part suitable for SAB Heli Devision Goblin RAW 420
Art. H1791-S

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

66,00 €*
SAB Goblin RAW 420 Plastic Carbon Rod Support Black

SAB Goblin RAW 420 Plastic Carbon Rod Support Black

Spare part suitable for SAB Heli Devision Goblin RAW 420
Art. H1463-B-S

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

5,50 €*
Servo Parts
NEXSPOR Servoarm Set strong Plasic for Microservos with toothing 25T 5mm

NEXSPOR Servoarm Set strong Plasic for Microservos with toothing 25T 5mm

Suitable for example Nexspor CLS2310S, KST DS215, X12, SAB DS12 and many more with the Toothing 25T Ø 5mm
Art. PSH-25T5MM-3S

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

6,90 €*

Wesentliche Information zu Kundenbewertungen:

Wir stellen nicht sicher, dass die veröffentlichten Bewertungen von solchen Verbrauchern stammen, die die Ware tatsächlich genutzt oder erworben haben.

No review available for this product.

* incl. tax, plus shipping costs

** for the payment method prepayment from the day after the customer´s payment instruction; for other payment methods from the day after the conclusion of the contract