SAB Goblin Black Nitro / Thunder Carbon Fiber Vertical Fin # H0684-S

Product number: H0684-S

Spare part suitable for SAB Heli Devision Goblin Black Nitro / Black Thunder

Questions about product Sign in to watch list

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

Carbon Fiber Vertical Fin

Includes:

- Carbon Fiber Vertical Fin x 1pc

- Socket head Cap Screw M3 x 12 x 2pcs

- ALuminum M3 Washer x 2pcs

- Yellow Sticker

Use for:

- Goblin Black Nitro/Thunder



Spare part suitable for:
SAB Goblin Black Nitro / Black Thunder

Customers also bought:

SAB Goblin Black Nitro / Thunder Aluminum Blade Grip Arm Black Matte

SAB Goblin Black Nitro / Thunder Aluminum Blade Grip Arm Black Matte

Spare part suitable for SAB Heli Devision Goblin Black Nitro / Black Thunder
Art. H0131BM-S

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

32,00 €*
SAB Goblin 700 / 770 / Kraken Spindle Shaft

SAB Goblin 700 / 770 / Kraken Spindle Shaft

Spare part suitable for: Goblin 700 / 770 / Kraken SAB Heli Devision # H0079-S
Art. H0079-S

Currently sold out

16,00 €*
Product Reminder
SAB Goblin 19mm PULLEY Z 22 6/8 MM HOLE

SAB Goblin 19mm PULLEY Z 22 6/8 MM HOLE

Spare part suitable for: Goblin  700 / 770 / Kraken SAB Heli Devision # H0175-22-S
Art. H0175-22-S

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

18,00 €*
SAB Goblin Thunder Sport Main Frame

SAB Goblin Thunder Sport Main Frame

Spare part suitable for SAB Heli Devision Goblin Thunder Sport
Art. H0931-S

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

22,00 €*

Wesentliche Information zu Kundenbewertungen:

Wir stellen nicht sicher, dass die veröffentlichten Bewertungen von solchen Verbrauchern stammen, die die Ware tatsächlich genutzt oder erworben haben.

No review available for this product.

* incl. tax, plus shipping costs

** for the payment method prepayment from the day after the customer´s payment instruction; for other payment methods from the day after the conclusion of the contract