SAB Goblin 630 / 700 / 770 SWASHPLATE # H0422-S

Product number: H0422-S

Replaced by: H0422BM-S

Questions about product Sign in to watch list

Sold out, no longer available

SWASHPLATE

Includes:

1x Spherical Bearing 12 x 22 x 7
2x Radial Bearing Ø30 x Ø37 x 4
1x Swashplate Upper Cup
1x Swashplate Bottom Cup
1x Swashplate Base Cup
3x Button Screw M2 x 5
4x Socket Screw M2 x 8
3x Steel Washer Ø2,2 x Ø5 x 0,3
1x Socket Screw M3 x 10
1x Uniball M3x4 Ø5 H18
6x Uniball M3x4 Ø5 H3

Spare part suitable for:
SAB Heli Devision Goblin Urukay/630/700/770/Competition/Speed

Customers also bought:

SAB Goblin Plastic ball linkages (10pcs)

SAB Goblin Plastic ball linkages (10pcs)

Spare part suitable for: Goblin 380 / 500 / 570 / 630 / 700 / 770 / Kraken SAB Heli Devision # H0066-S
Art. H0066-S

Currently sold out

11,00 €*
Product Reminder
SAB Goblin New Precision Design Plastic Ball Linkage - HPS2 / HPS3

SAB Goblin New Precision Design Plastic Ball Linkage - HPS2 / HPS3

Spare part suitable for: Goblin 630 / 700 / 770 / Kraken / HPS2/HPS3 SAB Heli Devision # H0402-S
Art. H0402-S

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

7,00 €*
SAB Goblin RADIUS PLASTIC ARM

SAB Goblin RADIUS PLASTIC ARM

Spare part suitable for: Goblin 500 / 570 /630 / 700 / 770 / Kraken SAB Heli Devision # H0205-S
Art. H0205-S

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

7,00 €*
Align T-REX 550 /600 /ESP M0.6 Torque Tube Front Drive Gear Set/40T

Align T-REX 550 /600 /ESP M0.6 Torque Tube Front Drive Gear Set/40T

Spare part suitable for: Align T-REX 550 / 600 / ESP / 600N - Align Prod. # H6NG001AXT
Art. H6NG001AX

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

19,69 €*

Wesentliche Information zu Kundenbewertungen:

Wir stellen nicht sicher, dass die veröffentlichten Bewertungen von solchen Verbrauchern stammen, die die Ware tatsächlich genutzt oder erworben haben.

No review available for this product.

* incl. tax, plus shipping costs

** for the payment method prepayment from the day after the customer´s payment instruction; for other payment methods from the day after the conclusion of the contract