SAB Goblin 630 / 700 / 770 Delrin Tecno Dampener - HPS # H0144-S

Product number: H0144-S

Spare part suitable for: Goblin 630/700 HPS head only - Goblin 770 HPS head SAB Heli Devision # H0144-S

Questions about product Sign in to watch list

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

Delrin Tecno Dampener - HPS

Includes:
CNC Delrin Dampener x 2pcs
Brass Shims Ø10 x Ø16 x 1 x 2pcs
Steel Shims Ø10 x Ø16 x 0,2 x 4pcs
O-ring 3050 x 4pcs

These are replacement delrin dampers for the Goblin HPS head system. These provide long life and perfect dampening for the Goblin helicopter.


Spare part suitable for:
SAB Heli Devision Goblin 630/700 HPS head only - Goblin 770 HPS head

Customers also bought:

SAB Goblin RABBER CANOPY

SAB Goblin RABBER CANOPY

Spare part suitable for: Goblin SAB Heli Devision # HA112-S
Art. HA112-S

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

7,00 €*
SAB Goblin 380 CANOPY KNOB

SAB Goblin 380 CANOPY KNOB

Spare part suitable for SAB Heli Devision Goblin 380
Art. H0543-S

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

8,00 €*
SAB Goblin 380 Aluminum Motor Pulley 24 Zähne

SAB Goblin 380 Aluminum Motor Pulley 24 Zähne

Spare part suitable for SAB Heli Devision Goblin Galaxy Visitor 6
Art. H0501-24-S

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

14,00 €*
SAB Goblin ABEC-5 Thrust bearing Ø10x Ø18 x 5,5 (2pcs)

SAB Goblin ABEC-5 Thrust bearing Ø10x Ø18 x 5,5 (2pcs)

Spare part suitable for: SAB Goblin SAB Heli Devision # HC438-S
Art. HC438-S

Currently sold out

5,50 €*
Product Reminder

Wesentliche Information zu Kundenbewertungen:

Wir stellen nicht sicher, dass die veröffentlichten Bewertungen von solchen Verbrauchern stammen, die die Ware tatsächlich genutzt oder erworben haben.

No review available for this product.

* incl. tax, plus shipping costs

** for the payment method prepayment from the day after the customer´s payment instruction; for other payment methods from the day after the conclusion of the contract