SAB Goblin 570 MOTOR MOUNT # H0291-S

Product number: H0291-S

Spare part suitable for: Goblin 570 SAB Heli Devision # H0291-S

Questions about product Sign in to watch list

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

MOTOR MOUNT

Includes:

- Aluminum Motor Mount x 1pc

- Spring de 5 / df ,3 / LL 6 x 2pcs

- Spring de 3 / df 0,53 / LL 35 x 2pcs

- Steel Washer Ø4,3 x Ø11 x 1 x 2pcs

- Metric Hex NYLON Nuts M4  H5 x 2pcs

- Socket Head Cap  M2,5x8 x 2pcs

- Aluminum Finishing Washer M2.5 x 2pcs

- DIN 12.9 Cup Point Set Screws M4x15 x 2pcs



Spare part suitable for:
SAB Heli Devision Goblin 570

Customers also bought:

ESC
Kontronik Brushless ESC KOLIBRI 140 LV-I

Kontronik Brushless ESC KOLIBRI 140 LV-I

with Telemetriy for Futaba, Multiplex, Graupner, Mikado and Jeti. 2-6 S LiPo, 6-25 V, 10A BEC
Art. 4340

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

329,90 €*
SAB Goblin Black Nitro / Thunder Aluminum Tail Side Plate Black Matte

SAB Goblin Black Nitro / Thunder Aluminum Tail Side Plate Black Matte

Spare part suitable for SAB Heli Devision Goblin Black Nitro / Black Thunder
Art. H0359BM-S

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

31,00 €*
SAB Goblin 500 Aluminum Finishing Washer M2.5

SAB Goblin 500 Aluminum Finishing Washer M2.5

Spare part suitable for: Goblin 500 SAB Heli Devision # H0255-S
Art. H0255-S

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

7,00 €*
SAB Goblin 500 Servohalterung

SAB Goblin 500 Servohalterung

Spare part suitable for: Goblin 500 SAB Heli Devision # H0208-S
Art. H0208-S

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

44,00 €*

Wesentliche Information zu Kundenbewertungen:

Wir stellen nicht sicher, dass die veröffentlichten Bewertungen von solchen Verbrauchern stammen, die die Ware tatsächlich genutzt oder erworben haben.

No review available for this product.

* incl. tax, plus shipping costs

** for the payment method prepayment from the day after the customer´s payment instruction; for other payment methods from the day after the conclusion of the contract