Align T-REX 700 / 800 Motor Slant Thread Pinion Gear 12T (L27) # H70G010XXT

Product number: H70G010XXT

Spare part suitable for: Align T-REX 700 / 800 - Align Prod. # H70G010XXW

Questions about product Sign in to watch list

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

Motor Slant Thread Pinion Gear 12T (L27)

1x Motor Slant Thread pinion gear 12T
2x M4 set screw (M4x4mm)

Highly enhance structural strength, effectively increase the torsional capability.

Must with CNC Slant Thread Main Drive Gear/112T(H70G002AXW)

Spare part suitable for:
Align T-REX 700 / 800

Customers also bought:

Main Rotorblades
MS Composit Rapid FBL CFC main blades 69 cm/12/5

MS Composit Rapid FBL CFC main blades 69 cm/12/5

Suitable for: T-REX 700 / Goblin 700 / Protos MAX / CORE 700 usw..MS Composit # MS-R90690FBL
Art. MS-R90690FBL

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

95,90 €*
Align T-Rex 700 / 800 One-way Bearing FE-423Z

Align T-Rex 700 / 800 One-way Bearing FE-423Z

suitable for: T-Rex 700 / 800 # H7NG004XXT
Art. H7NG004XXT

Currently sold out

46,19 €*
Product Reminder
Align T-REX 700 / 800 CNC Slant Thread Main Drive Gear/112T

Align T-REX 700 / 800 CNC Slant Thread Main Drive Gear/112T

Spare part suitable for: Align T-REX 700 / 800 - Align Prod. # H70G002AXT
Art. H70G002AXT

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

33,49 €*
Align Hook & Loop Fastening Tape (14x210mm)

Align Hook & Loop Fastening Tape (14x210mm)

Align Prod. # HOB00002T
Art. HOB00002

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

5,79 €*

Wesentliche Information zu Kundenbewertungen:

Wir stellen nicht sicher, dass die veröffentlichten Bewertungen von solchen Verbrauchern stammen, die die Ware tatsächlich genutzt oder erworben haben.

No review available for this product.

* incl. tax, plus shipping costs

** for the payment method prepayment from the day after the customer´s payment instruction; for other payment methods from the day after the conclusion of the contract