SAB Goblin Fireball / Mini Comet Anti-Static KIT # H0902-S

Product number: H0902-S

Spare part suitable for SAB Heli Devision Goblin Fireball / Mini Comet

Questions about product Sign in to watch list

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

Anti-Static KIT

Includes:
1x Static Column
1x Bearing 3 x 6 x 2,5
2x Socket Screw 1,6 x 5mm
1x Socket Screw 1,6 x 4mm
5x Eyelet Lug L=9.8mm, ID1=2.1mm, OD1=4.95mm, ID2=1.05mm, OD=2.5mm, TD=0.2mm
4x Washer 1,6 x 3,8 x 0,3mm
1x UL3239 3KV 30AWG OD1.0 Silicone Wire Yellow ( 50cm )
2x Washer 2,2 x 5 x 0,3

Spare part suitable for:
SAB Goblin Fireball / Mini Comet

Customers also bought:

SAB Goblin Fireball Uniball M2xØ4xH3

SAB Goblin Fireball Uniball M2xØ4xH3

Spare part suitable for SAB Heli Devision Goblin Fireball
Art. H0789-S

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

7,00 €*
Tail Rotorblades
SAB Goblin Fireball Tail Blade 50mm

SAB Goblin Fireball Tail Blade 50mm

Spare part suitable for SAB Heli Devision Goblin Fireball
Art. H0828-S

Currently sold out

6,00 €*
Product Reminder
Main Rotorblades
MS Composit Rapid FBL CFC main blades 28cm

MS Composit Rapid FBL CFC main blades 28cm

Suitable for: Goblin FireballMS Composit # MS-R20280FBL
Art. MS-R20280FBL

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

33,90 €*
SAB Goblin Fireball / Mini Comet Swashplate Leveler

SAB Goblin Fireball / Mini Comet Swashplate Leveler

Spare part suitable for SAB Heli Devision Goblin Fireball / Mini Comet
Art. H0928-S

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

21,00 €*

Wesentliche Information zu Kundenbewertungen:

Wir stellen nicht sicher, dass die veröffentlichten Bewertungen von solchen Verbrauchern stammen, die die Ware tatsächlich genutzt oder erworben haben.

No review available for this product.

* incl. tax, plus shipping costs

** for the payment method prepayment from the day after the customer´s payment instruction; for other payment methods from the day after the conclusion of the contract