Product 1 of 27

Servo King Mini HV Tailservo DS 795 iHV with Alu Housing # SKDS795iHV

Product number: SKDS795iHV

Item from manufacturer no longer available. For questions about a replacement item please contact us.

Questions about product Sign in to watch list

Sold out, no longer available

Servo King Mini HV Tailservo DS 795 iHV with Alu Housing

Operation Voltage: 4.8-8.2V
Weight: 50g(0.71oz)
Torque: 

    8.4(kg/cm)@4.8V
    9.6(kg/cm)@6V
    10.6(kg/cm)@7.4V

Speed: 

   0.035((sec/60∘)@6V
   0.032(sec/60∘)@7.4V   
   0.03(sec/60∘)@8.4V

Frequence: 760us/333 hz
Gear Type: metal Gear
Size: 15x36x35.5 mm

Customers also bought:

Motor
Kontronik MICROPYRO 380-09

Kontronik MICROPYRO 380-09

Power: 800W/rev/min: 920 Dimensions: Ø 40.5 x 41.5mm Weight: 150g Shaft: Ø 5mm / 22mm Suitable for example: Goblin 380, 420, OXY4 MAX, MSH Protos 380, KDS Chase 360 etc.
Art. 27012

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

229,90 €*
SAB Goblin Plastic ball linkages (10pcs)

SAB Goblin Plastic ball linkages (10pcs)

Spare part suitable for: Goblin 380 / 500 / 570 / 630 / 700 / 770 / Kraken SAB Heli Devision # H0066-S
Art. H0066-S

Currently sold out

11,00 €*
Product Reminder
SAB Goblin 380 Aluminum Motor Pulley 20 Zähne

SAB Goblin 380 Aluminum Motor Pulley 20 Zähne

Spare part suitable for SAB Heli Devision Goblin
Art. H0501-20-S

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

14,00 €*
SAB Goblin SAB Servoarm Set - Futaba / BK / MKS / Savox (7 Stück)

SAB Goblin SAB Servoarm Set - Futaba / BK / MKS / Savox (7 Stück)

Spare part suitable for SAB Heli Devision Goblin Galaxy Visitor 6
Art. HA052-S

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

14,00 €*

Wesentliche Information zu Kundenbewertungen:

Wir stellen nicht sicher, dass die veröffentlichten Bewertungen von solchen Verbrauchern stammen, die die Ware tatsächlich genutzt oder erworben haben.

No review available for this product.

* incl. tax, plus shipping costs

** for the payment method prepayment from the day after the customer´s payment instruction; for other payment methods from the day after the conclusion of the contract