SAB Goblin 770 COMPETITION Tail Boom Yellow # H0380-S

Product number: H0380-S

Spare part suitable for:Goblin 770 COMPETITIONSAB Heli Devision # H0380-S

Questions about product Sign in to watch list

Product Reminder

Currently sold out

Tail Boom Yellow

Includes:

- Carbon Fiber Tail Boom Yellow x 1pc

- Carbon Fiber Tail Locking Reinforcement x 2pcs

- Doulble Side Tape x 2pcs

- Cup Point Set Screws M3X20 x 1pc

- Washer Ø3,1 x Ø12 x 1.8 x 2pcs

- Metric hex locknut Nuts M3 H4 x 4pcs

- Aluminum Tail Boom Support x 2pcs

- Socket Head Cap M3x12 x 2pcs

- Nylon Screw M8 x 20 x 2pcs

- Flat Head Socket Cap M3x8 x 1pc



Spare part suitable for:
SAB Heli Devision Goblin 770 COMPETITION

Customers also bought:

SAB Goblin ABEC-5 Flanged bearing  Ø6 x Ø13 x 5 (2pcs)

SAB Goblin ABEC-5 Flanged bearing Ø6 x Ø13 x 5 (2pcs)

Spare part suitable for: SAB Goblin SAB Heli Devision # HC414-S
Art. HC414-S

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

5,50 €*
SAB Goblin 630 / 700 / 770 Battery Tray

SAB Goblin 630 / 700 / 770 Battery Tray

Spare part suitable for: Goblin 630 / 700 / 770 SAB Heli Devision # H0149-S
Art. H0149-S

Currently sold out

21,00 €*
Product Reminder
SAB Goblin 770 High Performance Tail Belt 2160-3-06

SAB Goblin 770 High Performance Tail Belt 2160-3-06

Spare part suitable for: Goblin 770 SAB Heli Devision # HC325-S
Art. HC325-S

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

42,00 €*
SAB Goblin Plastic ball linkages (10pcs)

SAB Goblin Plastic ball linkages (10pcs)

Spare part suitable for: Goblin 380 / 500 / 570 / 630 / 700 / 770 / Kraken SAB Heli Devision # H0066-S
Art. H0066-S

Currently sold out

11,00 €*
Product Reminder

Wesentliche Information zu Kundenbewertungen:

Wir stellen nicht sicher, dass die veröffentlichten Bewertungen von solchen Verbrauchern stammen, die die Ware tatsächlich genutzt oder erworben haben.

No review available for this product.

* incl. tax, plus shipping costs

** for the payment method prepayment from the day after the customer´s payment instruction; for other payment methods from the day after the conclusion of the contract