KST MS665 Digital Coreless Tail- Servo # MS665

Product number: MS665

Item from manufacturer no longer available. For questions about a replacement item please contact us.

Questions about product Sign in to watch list

Sold out, no longer available

KST MS665 Digital Coreless Tail- Servo



Technical specifications:

Operating Voltage:DC6.0V-8.4V
Size: 40.5*20*38mm
Torque:5.8kg.cm@6.0V; 6.8kg.cm@7.4V 7.5kg.com@8.4V
Speed:0.05sec/60°@6.0V 0.045sec/60°@7.4V0.04sec/60°@8.4V
Weight:69g
Working Frequence:760us/560Hz
Motor:Coreless
Ball Bearing:2BB
Position Sensor:Contactless


Suitable for:
Tail- Servo T-REX 550, 600, 700, 760, 800, Goblin 570, 630, 650, 700, 770, MSH PROTOS MAX 700, Mikado Logo 480, 550, 600, 700, 800, Soxos 550, 600, 700, 800 usw..

Customers also bought:

SAB Goblin ABEC-5 Thrust bearing Ø4 x Ø9 x 4 (2pcs)

SAB Goblin ABEC-5 Thrust bearing Ø4 x Ø9 x 4 (2pcs)

Spare part suitable for: SAB Goblin SAB Heli Devision # HC434-S
Art. HC434-S

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

5,50 €*
SAB Goblin 500 CANOPY POSITIONER

SAB Goblin 500 CANOPY POSITIONER

Spare part suitable for: Goblin 500 SAB Heli Devision # H0217-S
Art. H0217-S

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

7,00 €*
SAB Goblin Vite Nylon Esa M8x14 (4pcs)

SAB Goblin Vite Nylon Esa M8x14 (4pcs)

Spare part suitable for: SAB Goblin SAB Heli Devision # HC164-S
Art. HC164-S

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

5,50 €*
SAB Goblin 500 Steel Tail Spidle Shaft

SAB Goblin 500 Steel Tail Spidle Shaft

Spare part suitable for:Goblin 500SAB Heli Devision # H0220-S
Art. H0220-S

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

11,00 €*

Wesentliche Information zu Kundenbewertungen:

Wir stellen nicht sicher, dass die veröffentlichten Bewertungen von solchen Verbrauchern stammen, die die Ware tatsächlich genutzt oder erworben haben.

No review available for this product.

* incl. tax, plus shipping costs

** for the payment method prepayment from the day after the customer´s payment instruction; for other payment methods from the day after the conclusion of the contract