Align T-Rex 500 Scale Fuselage Short Tail Boom # HF5010

Product number: HF5010

Item from manufacturer no longer available. For questions about a replacement item please contact us.

Questions about product Sign in to watch list

Sold out, no longer available

500 Torque tube end x 2
500 UH-60 Tail boom (Ø15xØ16x152mm) x 1
500 UH-60 Torque Tube x 1
500 UH-60 tail linkage B (Ø2x180mm) x 1
Ball Link x 2

Spare part suitable for:
Align UH-60 500 Scale Fuselage (HF5006)
Align AH-1 500 Scale Fuselage (HF5007)

Customers also bought:

Align T-Rex 500E /ESP M0,6 Torque Tube Front Drive Gear Set/31T

Align T-Rex 500E /ESP M0,6 Torque Tube Front Drive Gear Set/31T

Spare part suitable for: Align T-Rex 500E / ESP # H50G003XX Align Prod. # H50G003XXT
Art. H50G003XX

Currently sold out

19,19 €*
Product Reminder
Align T-Rex 500 Four Blades Main Rotor Head assembly

Align T-Rex 500 Four Blades Main Rotor Head assembly

Compatible to: T-Rex 500, CopterX 500, KDS 500, Gaui Hurricane 425
Art. H50145

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

104,99 €*
Align T-Rex 500E / ESP / PRO / EFL Torque Tube Rear Drive Gear Set

Align T-Rex 500E / ESP / PRO / EFL Torque Tube Rear Drive Gear Set

Spare part suitable for: Align T-Rex 500E / ESP / PRO / 500EFL # H50G002XX Align Prod. # H50G002XXT
Art. H50G002XX

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

14,99 €*
Align T-Rex 500E PRO / 500EFL PRO Control link

Align T-Rex 500E PRO / 500EFL PRO Control link

Spare part suitable for: Align T-Rex 500E PRO / 500EFL PRO # H50175 Align Prod. # H50175T
Art. H50175

Currently sold out

8,09 €*
Product Reminder

Wesentliche Information zu Kundenbewertungen:

Wir stellen nicht sicher, dass die veröffentlichten Bewertungen von solchen Verbrauchern stammen, die die Ware tatsächlich genutzt oder erworben haben.

No review available for this product.

* incl. tax, plus shipping costs

** for the payment method prepayment from the day after the customer´s payment instruction; for other payment methods from the day after the conclusion of the contract