1st Brushless Motor 4125-830KV (6/8S) 5/32 # 1st9649-3

Product number: 1st9649-3

Questions about product Sign in to watch list

Product Reminder

Currently sold out

1st Brushless Motor 4125-830KV (6/8S)

Technical description:

Diameter Motor: 50mm
Length Motor: 53mm
Diameter Shaft : 5mm
Length Shaft: 32mm
RPM: 830 KV
Lipo max.: 8S
Poles: 12N10P
Weight: 346g
Holes: 2x M3/25mm and 2xM4/30mm
Maximum Current: 80A (Peak: 95A / 2 seconds)
Maximum Power: 2520W (Peak: 3000W / 2 seconds)

Attributes
will fit in SO-8876 | SO-8876-1 | SO-8876-2 | SO-8876-3 | SO-8876-4 | SO-8876-5 |SO-8876-6 |SO-8876-7 |
Module Motor
Part number 1st9649-3
LH Empfehlung SO-8876 | SO-8876-1 | SO-8876-2 | SO-8876-3 | SO-8876-4 | SO-8876-5 |SO-8876-6 |SO-8876-7 | SO-8866 | SO-8866-1 | SO-8866-2 | SO-8866-3 | SO-8866-4 | SO-8866-5 |SO-8866-6 |SO-8866-7 |

Customers also bought:

SAB Goblin Retaining Compound High Strength Bonding 10ml

SAB Goblin Retaining Compound High Strength Bonding 10ml

SAB Heli Devision Goblin
Art. HA115-S

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

11,00 €* 1.100,00 € / 1L
Helicopter
SAB Goblin 700 RAW PIUMA

SAB Goblin 700 RAW PIUMA

 
Art. SG749

Preorder possible

Delivery expected from: unbekannt

869,00 €*
Main Rotorblades
Align 380 Carbon Fiber Blades black

Align 380 Carbon Fiber Blades black

Spare part suitable for: Align - Align Prod. # HD380AT
Art. HD380A

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

23,09 €*
ESC accessories
YGE USB-Adapter

YGE USB-Adapter

Art. YGE-USB-ADAPTER

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

39,00 €*

Wesentliche Information zu Kundenbewertungen:

Wir stellen nicht sicher, dass die veröffentlichten Bewertungen von solchen Verbrauchern stammen, die die Ware tatsächlich genutzt oder erworben haben.

No review available for this product.

* incl. tax, plus shipping costs

** for the payment method prepayment from the day after the customer´s payment instruction; for other payment methods from the day after the conclusion of the contract