Scorpion V Link II Cable + SCO-1158

Product number: SCO-1158

Questions about product Sign in to watch list

Sold out, no longer available

With the new V Link II cable supported by Windows XP, Windows 7,8 and 10, you can always keep your ESC updated with the latest firmware, and make changes to your settings with ease!

The newly updated programming software has been hugely improved upon, and makes setup and tuning easier than eve

For download V link II Driver click here

Scorpion V Link II Cable User Manual V1 click here

A quick introduction to the Scorpion Commander V series ESC programming via the USB interface.
https://www.youtube.com/watch?v=tXh1p5Q9dGI

Included in the Box
1 x Scorpion V Link II Cable

Weight including packaging
30g

Attributes
Part number SCO-1158
Module ESC accessories

Customers also bought:

FBL Parts
Mikado VStabi NEO Connecting cable to RX-Sat

Mikado VStabi NEO Connecting cable to RX-Sat

suitable for Mikado VStabi NEOMikado # 04977
Art. MIK-04977

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

8,90 €*
Mikado VBar Control ESC-Cable, 350mm

Mikado VBar Control ESC-Cable, 350mm

suitable for Mikado VBar ControlMikado # 05088
Art. MIK-05088

Currently sold out

9,50 €*
Product Reminder
Geflechtschlauch 6mm schwarz 1m (Ausdehnung bis 11mm)

Geflechtschlauch 6mm schwarz 1m (Ausdehnung bis 11mm)

Art. ZB-61108

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

2,90 €*
Mikado VBar Control ESC-Cable, 500mm

Mikado VBar Control ESC-Cable, 500mm

suitable for Mikado VBar ControlMikado # 05089
Art. MIK-05089

Currently sold out

9,50 €*
Product Reminder

Wesentliche Information zu Kundenbewertungen:

Wir stellen nicht sicher, dass die veröffentlichten Bewertungen von solchen Verbrauchern stammen, die die Ware tatsächlich genutzt oder erworben haben.

No review available for this product.

* incl. tax, plus shipping costs

** for the payment method prepayment from the day after the customer´s payment instruction; for other payment methods from the day after the conclusion of the contract