Scorpion RC Backup Guard # SP-E006

Product number: SP-E006

Item from manufacturer no longer available. For questions about a replacement item please contact us.

Questions about product Sign in to watch list

Sold out, no longer available

Scorpion Backup Guard is a tiny and light UPS (Stand-By Power System) for RC Helicopter and Plane, if you are using a BEC and in case of BEC failure, the 5V output will allow your flight system to land safely with total confidence.

 

Specifications:

Weight : 38grams
Dimension: 55mm x 31mm x 15mm
Li-Po Specification: 2S/7.4V/500mAh
Output: DC 5V/ 10 Amp Peak/ Output Only
Charging Plug: JST-XHR


Included in the Box:

1x Scorpion Backup Guard
1x User Manual

Customers also bought:

Gold Connector 3mm Set male + female / 5PCS

Gold Connector 3mm Set male + female / 5PCS

Art. ZB-G-SB-30-5

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

4,50 €* 0,45 € / Stück
SAB Goblin 630 Spindle Shaft

SAB Goblin 630 Spindle Shaft

Spare part suitable for: Goblin 630 SAB Heli Devision # H0097-S
Art. H0097-S

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

14,00 €*
SAB Goblin 630 / 700 / 770 Delrin Tecno Dampener - HPS

SAB Goblin 630 / 700 / 770 Delrin Tecno Dampener - HPS

Spare part suitable for: Goblin 630/700 HPS head only - Goblin 770 HPS head SAB Heli Devision # H0144-S
Art. H0144-S

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

15,00 €*
SAB Goblin ABEC-5 Thrust bearing Ø10x Ø18 x 5,5 (2pcs)

SAB Goblin ABEC-5 Thrust bearing Ø10x Ø18 x 5,5 (2pcs)

Spare part suitable for: SAB Goblin SAB Heli Devision # HC438-S
Art. HC438-S

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

5,50 €*

Wesentliche Information zu Kundenbewertungen:

Wir stellen nicht sicher, dass die veröffentlichten Bewertungen von solchen Verbrauchern stammen, die die Ware tatsächlich genutzt oder erworben haben.

No review available for this product.

* incl. tax, plus shipping costs

** for the payment method prepayment from the day after the customer´s payment instruction; for other payment methods from the day after the conclusion of the contract