SAB Goblin KIT TOOLS, 1,5-2-2,5-3 + TOLLS CASE # HM054

Product number: HM054

Item from manufacturer no longer available. For questions about a replacement item please contact us.

Questions about product Sign in to watch list

Sold out, no longer available

KIT TOOLS, 1,5-2-2,5-3 + TOLLS CASE

Includes:

1pc - Comfort Grip Hex tool 1.5 
1pc - Comfort Grip Hex tool 2.0 
1pc - Comfort Grip Hex tool 2.5 
1pc - Comfort Grip Hex tool 3.0 
1pc - SAB Tool Case

SAB Comfort Grip Hex tools are our solution in matter of tools.

 - Shaped for ideal torque
 - Adjustable Tip Length
 - Color coded for easy size recognize
 - Comfortable handle and strong grip

Customers also bought:

SAB Goblin 630 / 700 / 770 Battery Tray

SAB Goblin 630 / 700 / 770 Battery Tray

Spare part suitable for: Goblin 630 / 700 / 770 SAB Heli Devision # H0149-S
Art. H0149-S

Currently sold out

21,00 €*
Product Reminder
Connection cable 4mm Banana female to XT60 female

Connection cable 4mm Banana female to XT60 female

Connection cable 4mm Banana female to XT60 femaleauf XT60 Stecker
Art. ZB-BB4-XT60

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

4,90 €*
XT90 Gold Connector 4,5mm with yellow case

XT90 Gold Connector 4,5mm with yellow case

Art. ZB-BU-XT-90

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

1,90 €*
iKON / Brain Drehzahlreger (Governor) Adapter Kabel 90mm

iKON / Brain Drehzahlreger (Governor) Adapter Kabel 90mm

Wird benötigt zur Nutzung der Drehzahlrgler Funktion des iKON / Brain Flybarlesssystems
Art. MSH51605

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

4,90 €*

Wesentliche Information zu Kundenbewertungen:

Wir stellen nicht sicher, dass die veröffentlichten Bewertungen von solchen Verbrauchern stammen, die die Ware tatsächlich genutzt oder erworben haben.

No review available for this product.

* incl. tax, plus shipping costs

** for the payment method prepayment from the day after the customer´s payment instruction; for other payment methods from the day after the conclusion of the contract