SAB Goblin 630 / 700 / 770 Steel Main Linkage - HPS # H0170-S

Product number: H0170-S

Replacement item H0417-S

Questions about product Sign in to watch list

Sold out, no longer available

Steel Main Linkage - HPS

Includes:
Steel main linkage x 2pcs
Plastic ball linkages x 4pcs

Replacement linkage set for Goblin helicopters using HPS heads. These are replacement turnbuckle style linkages to go between the swashplate and the blade grips.

Spare part suitable for:
SAB Heli Devision Goblin 630/700 HPS head only - Goblin 770

Customers also bought:

SAB Goblin 630 / 700 / 770 Aluminum Canopy Knobs (2pcs)

SAB Goblin 630 / 700 / 770 Aluminum Canopy Knobs (2pcs)

Spare part suitable for: Goblin 630 / 700 / 770 SAB Heli Devision # H0036-S
Art. H0036-S

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

7,00 €*
SAB Goblin 630 / 700 New Main Shaft with M4 Locking Collar

SAB Goblin 630 / 700 New Main Shaft with M4 Locking Collar

Spare part suitable for:Goblin 630 / 700SAB Heli Devision # H0122-S
Art. H0122-S

Currently sold out

25,00 €*
Product Reminder
SAB Goblin 380 / 630 / 700 / 770  / Kraken UNIBALL (5pcs)

SAB Goblin 380 / 630 / 700 / 770 / Kraken UNIBALL (5pcs)

Spare part suitable for: Goblin 380 / 630 / 700 / 770 / Kraken SAB Heli Devision # H0064-S
Art. H0064-S

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

13,00 €*
SAB Goblin 700 CF TAIL PUSH ROD Ø4 X Ø2,5 X 702

SAB Goblin 700 CF TAIL PUSH ROD Ø4 X Ø2,5 X 702

Spare part suitable for: Goblin 700 SAB Heli Devision # HC239-S
Art. HC239-S

In stock, available

Within DE: 2 Business Days **
Outside DE: 5 Business Days**

9,00 €*

Wesentliche Information zu Kundenbewertungen:

Wir stellen nicht sicher, dass die veröffentlichten Bewertungen von solchen Verbrauchern stammen, die die Ware tatsächlich genutzt oder erworben haben.

No review available for this product.

* incl. tax, plus shipping costs

** for the payment method prepayment from the day after the customer´s payment instruction; for other payment methods from the day after the conclusion of the contract